| NCR | Part / Issue | Product / System | Found | Severity | Status | Disposition | CAR | Age | |
|---|---|---|---|---|---|---|---|---|---|
| Loading… | |||||||||
Open a CAR (D1 — Open and assign)
| CAR | Type | Title | Owner | Stage | NCRs | Next Due | Age | |
|---|---|---|---|---|---|---|---|---|
| Loading… | ||||||||
Quality Metrics — NCR / CAR / COPQ
1 · NCRs opened and closed, by source
| Source (where found) | Opened | Closed | Open now | Avg days to disposition |
|---|
2 · Cost of poor quality (scrap + rework labor + freight)
3 · Open CARs by age and by stage
| Stage | Open | Overdue | Oldest (days) |
|---|
4 · CARs closed and effectiveness
5 · Top repeat part numbers and failure modes (trigger 4 watch, rolling 90 days)
| # | Part number / failure mode | NCRs in 90 days | Status |
|---|
6 · Timeline performance vs. target
| Step | Target | Measured (period) | On time |
|---|
✓ NCR Opened —
Logged to the QMS database.
Nonconformance Report (NCR)
1. Stop work on the item and do not pass it on. 2. Tag it with a red HOLD tag and segregate it (or tag in place). 3. Open the NCR below — same shift.
Plan a New Audit
| Audit | Title | Standard | Type | Status | Scheduled | Lead Auditor | Findings | |
|---|---|---|---|---|---|---|---|---|
| Loading… | ||||||||
Add a Standard (e.g. ISO 14001, ISO 45001)
Add Clause to
| Clause | Requirement | Status | Evidence / Finding |
|---|
Management Review Report
1 · QMS Performance — Nonconformances
2 · Internal Audit Program
| Audit | Clause | Type | Finding | NCR | Status |
|---|
3 · Compliance Status by Standard
| Standard | Status | Compliant | Minor NC | Major NC | Not Assessed | Score |
|---|
4 · Items Requiring Management Attention
| NCR | Severity | Status | Issue | Product / System | Age (days) |
|---|
5 · Review Record (Clause 9.3.3 Outputs)
| Review Date | Period | Attendees | Decisions & Actions |
|---|
Register a Document
| Doc # | Title | Category | Rev | Notes | |
|---|---|---|---|---|---|
| Loading… | |||||
1 · Getting Started
QualityOS is Bergan Marine Systems' quality management application. It is the system of record for the BMS Nonconformance & Corrective Action Procedure (NCRs, CARs and SCARs — ISO 9001:2015 clauses 8.7, 10.2 and 8.4), plus internal audits (9.2), compliance status, management review (9.3) and the controlled document register (7.5).
- Sign in with your company email and the password provided by the Quality team. There is no self-registration — contact Quality for an account.
- Pages: NCRs CARs REPORT ISSUE METRICS INTERNAL AUDITS COMPLIANCE MGMT REVIEW DOCS HELP
- Data saves to the company database instantly. Use ↻ REFRESH to pull in changes made by others.
- The NCR/CAR log the procedure calls for (section 10) is this application: every NCR and CAR carries number, status, owner, dates, cost and linkage, and either can be traced to the other.
2 · What is an NCR, a CAR, a SCAR?
| Term | Meaning |
|---|---|
| Nonconformance | Failure to meet a specified requirement: drawing, spec, PO, contract, procedure or regulation. |
| NCR | Nonconformance Report. Records a specific nonconforming item and its containment and disposition. Every nonconformance gets an NCR, however small. Most close on disposition alone. |
| CAR | Corrective Action Request. Records root cause analysis and action to stop a nonconformity from recurring. Opened only when a section 6 trigger is met. |
| SCAR | Supplier Corrective Action Request. A CAR issued to a supplier (S-CAR). BMS still owns the outcome to our customer. |
| Containment | Immediate action to stop suspect items from moving further: tag, segregate, hold, recall. |
| Correction | Fixing the item at hand (rework, replace). Not the same as corrective action. |
| Root cause | The underlying system reason the nonconformity happened and was not caught. |
| Effectiveness check | Objective evidence, after a set period, that the corrective action stopped recurrence. |
| MRB | Material Review Board. Quality plus Engineering (plus Program/Ops as needed) with authority to disposition NCRs. |
Dispositions: Use-as-is — accepted without change, requirement not met · Repair — made fit for use but still does not fully meet the requirement · Rework — brought fully back into conformance · Return to vendor (RTV) — back to the supplier for credit or replacement · Scrap — rendered unusable and discarded.
3 · Opening an NCR (any employee — steps 1 to 3)
- Identify and stop. Stop work on the item and do not pass it on.
- Tag and segregate. Apply a red HOLD tag with the NCR number. Move it to the MRB/quarantine area, or tag in place if it cannot be moved. Mark ERP inventory as on hold.
- Open the NCR — same shift. On REPORT ISSUE record part number, revision, serial or lot, quantity; job/PO, customer and hull/vessel; where found (receiving, in-process, final test, field, customer); the requirement vs. the actual condition, with photos and measurements. Tick safety- or class-critical for overfill/high-level alarms, ABS/USCG-approved equipment and hazardous-area components — it changes who can disposition the item.
Optionally link an FSM work order (type the WO number or vessel name). On a phone, 📷 TAKE PHOTO opens the camera. You get an NCR number instantly; a ClickUp task is created and the Quality team is emailed.
4 · Working an NCR (Quality — steps 4 to 8)
Open any NCR from the NCRs register. The detail view walks the procedure in order; each step shows its target date and turns red when it is late.
- Contain (24 hours). Check for other suspect items — stock, WIP, kits and units already shipped. Record quantities checked and found. Set status to Contained.
- Disposition (5 business days). Pick the disposition; the app shows who must approve it (section 5 authority matrix) and whether the customer must approve in writing. Record who decided and why. Status becomes Dispositioned.
- Carry out and verify. Rework/repair is done to a written instruction; Quality re-inspects before the HOLD tag comes off and records the verifier.
- Escalation check. The app pre-evaluates the ten section 6 triggers from the NCR data (highlighted in yellow); Quality confirms or adjusts, records CAR required: yes/no and the reason either way, and opens or links the CAR from the same screen.
- Close. Enter scrap, rework labor and freight cost (COPQ) and set the status to Closed. The app will not close an NCR without a disposition, the escalation decision, verification where rework/repair was done, and the customer's written approval where it is required.
Disposition authority (section 5)
| Disposition | Who can approve | Customer approval |
|---|---|---|
| Scrap | Quality | No |
| Return to vendor | Quality + Purchasing | No |
| Rework (back to print) | Quality | No |
| Repair | MRB (Quality + Engineering) | Yes, if the item is a contract deliverable or the contract requires it |
| Use-as-is, BMS internal requirement only | MRB (Quality + Engineering) | No |
| Use-as-is, customer or contract requirement | MRB, then Program Manager submits a waiver/deviation | Yes — written approval before shipment |
Government and shipyard work: never ship a repaired or use-as-is item against a NAVSEA, MSC, USCG or shipyard requirement without the customer's written waiver or deviation. Keep the approval with the NCR (attach it). Safety- or classification-critical items: use-as-is and repair are not permitted without Engineering and Quality Manager sign-off, even when the requirement is internal.
5 · When to open a CAR (section 6 triggers)
Open a CAR when any trigger below is met. Quality decides borderline cases and records the reason either way. Bracketed thresholds are starting values — tune them after two quarters of data (they live in the settings table and drive the automatic evaluation).
| # | Trigger | Source |
|---|---|---|
| 1 | Nonconformance reached a customer or the field (escape) | NCR, complaint |
| 2 | Customer complaint or customer-issued corrective action request | Customer |
| 3 | Safety-, overfill-, or class/regulatory-critical nonconformance | NCR |
| 4 | Same part number or same failure mode on [3] or more NCRs in [90] days | NCR trend |
| 5 | Single NCR cost over [$2,500] in scrap, rework labor and freight | NCR |
| 6 | Use-as-is or repair that needed a customer waiver/deviation | NCR |
| 7 | Major nonconformity from a registrar or customer audit | Audit |
| 8 | Minor audit finding Quality judges systemic, or repeated from the last audit | Audit |
| 9 | Process failure with no bad product: missed calibration, superseded drawing used, training lapse | Internal |
| 10 | Supplier problem meeting triggers 1, 3, 4 or 5 → issue a SCAR | NCR, receiving |
Do not open a CAR for a one-off NCR with an obvious, contained cause, such as a single shipping-damaged part already replaced. Track it; trigger 4 will catch it if it repeats.
6 · Working a CAR (simplified 8D)
The CARs page is the CAR/SCAR register. Open a CAR from an NCR's escalation check (preferred — it carries the triggers and link across) or with + NEW CAR / SCAR for audit, customer or process CARs. The stage bar shows where the CAR is; each stage shows its due date.
- D1 Open and assign. Quality assigns the owner from the process where the cause sits — not automatically Quality. Link all related NCRs, complaints or audit findings.
- D2 Describe the problem. What, where, when, how many, how found. Data, not opinion.
- D3 Confirm containment. Usually done under the NCR — reference it; record containment here for audit and process CARs.
- D4 Root cause — 15 business days. 5 Whys for simple problems, fishbone for complex ones. Answer both questions: why did it happen? and why did our checks not catch it? "Operator error" or "retrain" alone is not accepted — the app flags it.
- D5 Plan corrective action. Add actions, each with an owner and due date. Prefer error-proofing, drawing/procedure changes and added inspection points over reminders.
- D6 Implement — 30 business days from root cause unless Quality approves a longer date (record who approved). Attach evidence: revised documents, training records, photos of fixtures.
- D7 Prevent elsewhere. Check similar products, sites and processes; update risk register, PFMEA, work instructions and inspection plans.
- D8 Verify effectiveness — 60 to 90 days after implementation. Quality checks for recurrence using NCR data, audit or sampling, records the evidence and the result. Pass closes the CAR. Fail reopens it at D4 — the first root cause was wrong or incomplete (the app does this automatically and counts the loop).
7 · Supplier corrective action (SCAR, section 8)
- Purchasing sends the SCAR with the NCR, photos and requirement, and asks for containment of the supplier's stock and in-transit material within 2 business days. Enter the sent date — the app sets both due dates.
- Supplier returns root cause and corrective action within 30 days, using their own 8D or the BMS SCAR form.
- Quality reviews the response. Reject vague answers ("operator retrained") and send back — mark the response not accepted and record why.
- BMS applies tightened receiving inspection on that supplier's part until 3 consecutive lots pass — count them on the CAR.
- Close when the supplier response is accepted and tightened inspection is released.
- SCAR count and response time feed the supplier scorecard (see METRICS) and the approved supplier list review.
If BMS's own requirement was unclear (wrong revision on the PO, missing spec), open an internal CAR as well and link it.
8 · Timelines, metrics and management review (section 9)
| Step | Target |
|---|---|
| NCR opened | Same shift as discovery |
| Containment complete | 24 hours |
| NCR disposition | 5 business days |
| CAR root cause | 15 business days from open |
| CAR actions implemented | 30 business days from root cause |
| CAR effectiveness check | 60–90 days after implementation |
| SCAR supplier response | 30 days |
The METRICS page produces the Quality Manager's weekly numbers for the ops report: NCRs opened and closed by source, open NCRs past the 5-day disposition target, COPQ month to date, open CARs by age (0–30, 31–60, 61–90, 90+) and by stage, CARs closed and the effectiveness pass rate, and the top repeat part numbers or failure modes. MGMT REVIEW adds NCR/CAR trends, COPQ, overdue CARs, effectiveness, supplier performance and whether the section 6 thresholds still fit — at least annually, quarterly recommended.
9 · Internal Audits (ISO 9001 clause 9.2)
- On INTERNAL AUDITS, press + NEW AUDIT to plan an audit: standard, type (Internal/External/Supplier), title, lead auditor, area, clauses covered, scope. Audits are auto-numbered (AUD-YYYY-NN).
- Open an audit and record findings as you go: clause, type (Major NC, Minor NC, Observation, OFI, Conformity), description, and objective evidence.
- For any Major or Minor NC, press RAISE NCR. A major finding meets trigger 7; a minor finding Quality judges systemic meets trigger 8 — open an A-CAR from the NCR's escalation check.
- Update the audit status (Planned → In Progress → Complete → Closed) and write the summary/conclusion.
10 · Compliance, Management Review and Document Register
- COMPLIANCE — select the standard, click a clause, set its assessment (Compliant / Minor NC / Major NC / Not Assessed) and record the evidence on file. ⬇ CSV exports the assessment.
- MGMT REVIEW — a live report for the review meeting and the ISO auditor. Section 5 is the clause 9.3.3 review record: enter the review date, attendees and decisions, then RECORD REVIEW.
- DOCS — controlled QMS documents with SharePoint links. The Nonconformance & Corrective Action Procedure is registered here; Quality assigns its document number and revision.
11 · Records, integrations and imported data
- Records (section 10). NCRs, CARs and SCARs are quality records under clause 7.5. Attachments (photos, measurements, customer waivers, revised documents, training records, effectiveness evidence) live with the record. Retention is [10] years minimum, or longer where the contract requires.
- ClickUp — every new NCR auto-creates a task for the Quality team (once API secrets are configured). Microsoft 365 — the Quality team is notified by email on each new NCR. FSM — NCRs can link to Field Service work orders, vessels and customers.
- Imported data. The 2026 CAR Log (CARs 2026-001 to 2026-011) was imported from SharePoint with original numbers and dates; each now appears on the CARs page linked to its originating NCR record. New CARs are numbered CAR-YYYY-NNN, continuing after the imported ones. The 2026 internal audit program, the 2025 & 2026 management review records, ISO 9001 clause evidence and the document register were also imported.
Should I still use the Excel CAR Log? No — NCRs and CARs are raised here. The Excel log remains on SharePoint as the historical record.
Printing looks wrong. Use the page's own 🖨 button, portrait orientation, and enable "background graphics" in the print dialog.